Shoket, Israel

30,000 m3 of sludge per day

12.1 MWh

Construction, startup, commissioning of the Shoket WWTP with capacity of 30,000 m3/day


The facility was built using activated sludge technology and treats wastewater to a tertiary level, by additional sand filtration and disinfection. The treated water is reused for agricultural irrigation. Works included earth works, civil works, sealing, pipe laying, valves, gates, etc., sanitary installation works; supply and installation, startup and commissioning  of equipment; instrumentation, electrical and control systems, SCADA and landscape, etc.