
High way roads, Israel

12,000 m³/d

12.1 MWh
Shtang constructed a wastewater treatment plant using the SBR technology, with gravitational tertiary treatment and aerobic sludge digestion. The project was a DBOT, in which the company undertook the financing, design and construction, as well as operation and maintenance for a period of 25 years.
The works included a pre-treatment system, biological treatment systems, clarification, gravitational tertiary filtration and sludge treatment.